|
| |
|
|
|
|
| |
| |
| |
 |
 |
Ongoing Turnkey Projects |
Bharuch Eco Aqua Infrastructure Ltd. |
Engineering,
Procurement and construction of
sump, pump house at GIDC Jhagadia
and installation of GRP Pipeline
of 60 MLD capacity from Jhagadia
pumping station to Hansot at Jhagadia,
Via. Ankleshwar (Piraman) under
effluent disposal project for Jhagadia
Industrial Estate
|
 |
 |
Completed Projects |
|
|
| |
|
|
| |
SUPPLY,
FABRICATION, ERECTION AND INSTALLATION
OF FRP/PVC/HDPE ITEMS FOR UASB BASED SEWAGE
TREATMENT PLANT |
|
| |
- 635 MLD Water Treatment
Plant at Sonia Vihar, Delhi
- 345 MLD STP at Lucknow
- 339 MLD STP at Nagole,
Hyderabad
- 275 MLD Water Treatment
Plant, Ahmedabad
- 172 MLD STP at Nagole,
Hyderabad
- 152 MLD STP at Ludhiana,
Punjab
- 126 MLD STP at Vasana,
Ahmedabad
- 106 MLD STP at Pirana,
Ahmedabad
- 100 MLD STP at Jalandhar,
Punjab
- 100 MLD STP at Palsana,
Surat
- 100 MLD STP at Barmoli,
Surat for Fabrication, Erection and
Commissioning of PVC Domes
- 78 MLD STP at Kabitkhedi,
Indore
- 52 MLD STP at Mohali,
Punjab
- 50 MLD STP at Nashik,
Maharashtra
- 48 MLD STP at Jamalpur,
Punjab
- 45 MLD STP at Mohali,
Punjab
- 43.5 MLD STP at Manglore
- 43.5 MLD STP at Baroda
for Fabrication, Erection and Commissioning
of PVC Dome 3Reactors.
- 43 MLD STP at Baroda
- 30 MLD STP at Rajamundry,
A.P
- 30 MLD STP at Hyderabad,
A.P.
- 25 MLD STP at Kapurthala,
Punjab
- 25 MLD STP at Chandigarh,
H.U.D.A.
- 20 MLD STP at Phagwara,
Punjab
- 20 MLD STP FRP equipments
& GRP piping at Rasalkhema, U.A.E.
Phase – I
- 15 MLD STP at Rampur,
U.P.
- 14 MLD STP at Rampur,
U.P.
- 12 MLD STP at Indore,
M.P.
- 2 MLD STP at Peramunram,
Chennai
- 1.2 MLD STP at Trinidad,
West Indies
- 0.6 MLD STP at Valia,
Ankleshwar
- FRP Items for Lamella
Clarifier in Sc. Lucia, West Indies
- 0.25 MLD STP at Kanpur
(for slaughter house)
|
|
|
|
|
|
|